Bathroom Remodel- (Fairhaven, Maryland)
Tear-out old bathroom and build a new shower and vanity top.
A heat blanket was installed and Porcelain tile was used on floor.  
A new vanity installed and and a banjo top was built & tiled. 

before01.jpg (20068 bytes)

05.jpg (39930 bytes)

25.jpg (43646 bytes)
29.jpg (45830 bytes)

31.jpg (27245 bytes)

vanity- before, after tear-out, new vanity installed- banjo top built,
finished vanity- sink installed,

 

before02.jpg (17222 bytes)

35c.jpg (31395 bytes)

shower before, after tear-out, prepped and ready for tile, finished shower

 

before03.jpg (37594 bytes) 06.jpg (39548 bytes)
091.jpg (36220 bytes) 19.jpg (53322 bytes)

tub before, after tear-out, shower liner installed, wall tile and 
tumbled marble installed on shower floor.  

 

24.jpg (35328 bytes) 27.jpg (36650 bytes)
heat blanket installed

 

 tile floor over heat blanket

 

32.jpg (27189 bytes) 341.jpg (45578 bytes)
finished